Biosystems Engineering
Permanent URI for this community
Browse
Browsing Biosystems Engineering by Author "Kivumbi, Bernard"
Now showing 1 - 1 of 1
Results Per Page
Sort Options
Item Techno-economic assessment of municipal solid waste gasification for electricity generation:(CIGR Journal, 2015-10-14) Kivumbi, Bernard; Olwa, Joseph; Martin, Andrew; Menya, EmmanuelThis study was aimed at assessing the techno-economic potential of municipal solid waste (MSW) generated in Kampala City for electricity production through gasification. The quantity, characteristics, and gasification parameters were determined. In addition, the gasifier-engine system components were sized, and an economic analysis was conducted to obtain the net present value (NPV) and the payback period. This study found that 523 t/d of MSW is collected in Kampala City. The biomass component of MSW was found to be 459.5 t/d with a moisture content of 71.09% on an as-received basis. The physical characteristics of the gasified biomass included 11.8% moisture content, 88.2% total solids, 25.9% ash content and 57.7 kg/m3bulk density. The resulting normalized producer gas constituted 11.64% H2, 13.70% CO, 16.09% CO2, 54.12% N2, 4.45% CH4and a lower heating value (LHV) of 4.75 MJ/Nm3. The design fuel flow rate of 0.23 kg/s, specific gasification rate (SGR) of 5089.29 kg h-1m-2and specific energy demand of 42.75 GJ m-2h-1were obtained. This yields a net electrical power output of 425.17 kW with an overall efficiency of 15.6%. The net annual electricity generation from a single gasifier-engine system was found to be 2.97 GWh/a. The economic analysis for this system worth $887 333 of investment cost yielded a payback period of 6.57 years while the NPV at 6% interest rate was found to be nine years with a value of $316 47.